Organized Manager experienced in achieving tangible results through cross-team collaboration and effective problem-solving. Delivered energy management strategies that optimized resource use and reduced costs by identifying and implementing data-driven energy-saving opportunities. Focused on partnering with like-minded individuals to drive sustainability goals.
Work History
Manager of Energy Efficiency
4 Years 5 Months
Electricity Company Of Ghana, ECG | 2022.03 - Current
Supervised power quality assessment, energy audit, and solar integration for GCB Bank Plc's 129 branches
Supervised the energy audit and power quality assessment for the Parliament House
Collected and analyzed clients' electricity information to determine areas of energy optimization.
Supervised energy audit for ECG headoffice and Projects Office
Educated staff at selected ECG facilities on the significance of minimizing electricity consumption at work and home.
Supervised a team to conduct energy audit for Tang Palace Hotel
Member, Committee for tender evaluation team for solar home systems
Electricity Company of Ghana (ECG) | 2020.11 - 2022.02
Conducted comprehensive assessment on power quality and executed energy audit for State Interest and Governance Agency (SIGA), identifying key opportunities for improvement.
Assisted in implementing renewable energy and energy efficiency strategies in Public Sector Ghana Project by GIZ, contributing to sustainable energy practices.
Managed and supervised operations of energy support service section, ensuring compliance with safety and efficiency standards.
Electricity Company of Ghana (ECG) | 2016.06 - 2020.10
Supervised technical loss estimation for ECG's designated districts, improving accuracy in loss reporting.
Conducted financial and economic analysis supporting implementation of voltage regulators on 33kV feeders from Kasoa Switching Station, enhancing voltage stability.
Performed Distribution Reliability study and financial justification for implementing Distribution Automation System (DAS) on 33 kV distribution feeders, optimizing system reliability.
Conducted a study to justify the construction of Elubo Bulk Supply Point (BSP) financially and economically.
Collaborated with teams on multiple tender preparation and evaluation projects.
Electrical Engineer/System Planning
5 Years 1 Month
Electricity Company of Ghana | 2011.04 - 2016.05
Conducted Sub-transmission Reliability Studies on ECG Accra and Tema Network, analyzing N-1 and Bulk Supply Point (BSP) single contingency factors to enhance network reliability.
Conducted Grid Impact Studies for Cape Coast BSP
Led project as Project Engineer to supply and install 11kV feeders for six primary substations, improving power distribution capabilities.
Delivered consultancy on National Technical and Commercial Loss Study for ECG, contributing expertise as Counterpart Staff.
Assistant Electrical Engineer/System Planning
3 Years 3 Months
Electricity Company of Ghana | 2007.12 - 2011.03
Supported Power Factor Correction Assessments for eight ECG Special Load Tariff customers, enhancing their energy efficiency.
Compiled quarterly and annual reports for System Planning Division, providing insights for decision-making.
Performed load flow and short circuit analysis for ECG 33 kV and 11 kV networks, ensuring system reliability and performance.
Education
MSc Telecommunication Engineering
Ghana Technology University College | Accra | 12.2012
BSc - Electrical and Electronic Engineering
Kwame Nkrumah University of Science And Technology | Tarkwa | 12.2006
Senior Program Officer, Energy Efficiency and Sustainability at Energy Commission GhanaSenior Program Officer, Energy Efficiency and Sustainability at Energy Commission Ghana