
A data driven free spirited and hardworking person, with good coordination and great communication skills. A good team player who can influence without authority, and can work in extreme situations when needed. Also, adhere to the rules and culture of an organization. Honest individual with exceptional background spent in Food and beverage industry. Engaging demeanor to work in demanding environments. Over three years in quality assurance, testing and process improvement.
The fundamentals of project management
Project initiating
Project planning: putting the work together
project Execution: closing the project
Agile Project management
Scrum master
Procurement
Cooperate Mergers and Acquisitions
Cooperate synergies
Public Equity
Project management foundation and frameworks.
Data Analysis
Data Collection
General Science
Project Objective:
The objective of the water treatment system project was to design, implement, and maintain a comprehensive water treatment infrastructure to ensure the supply of safe and clean drinking water to a specific community or region.
Outcome:
The project successfully delivered a robust and sustainable water treatment system that significantly improved the quality of water available to the target population. This led to a reduction in waterborne diseases, improved public health, and increased access to potable water.
My Role on the Project:
I served as a key member of the project team with a focus on technical expertise and project management.
Responsibilities and Deliverables:
Needs Assessment: Conducted a thorough analysis of the region's water sources, identifying contaminants, water quality issues, and the specific needs of the community.
System Design: Collaborated with engineers and water quality experts to design a customized water treatment system tailored to the identified needs. This included selecting appropriate treatment methods such as filtration, chlorination, UV disinfection, and chemical dosing.
Regulatory Compliance: Ensured that the water treatment system adhered to all relevant local and national regulations and standards for water quality and safety.
Procurement: Managed the procurement process, including sourcing equipment and materials, negotiating contracts with suppliers, and ensuring timely delivery.
Installation and Construction: Oversaw the construction and installation of the water treatment system, coordinating with contractors and local authorities to ensure proper implementation.
Testing and Quality Assurance: Conducted rigorous testing and quality control checks at various stages of the project to verify the effectiveness of the treatment system and compliance with safety standards.
Training and Capacity Building: Organized training sessions for local operators and maintenance personnel to ensure they could operate and maintain the system effectively.
Sustainability Planning: Developed a sustainability plan to ensure the long-term operation and maintenance of the water treatment system, including budgeting and training.
Monitoring and Maintenance: Established a routine monitoring and maintenance schedule to ensure the continued functionality and efficiency of the system, including regular water quality testing.
Documentation and Reporting: Maintained detailed project records, produced progress reports, and communicated project updates to stakeholders, including community leaders and funding organizations.
Overall, the water treatment system project aimed to improve public health and quality of life for the target community by providing a reliable and sustainable source of clean drinking water. My role encompassed a wide range of responsibilities, from initial design to ongoing maintenance, to achieve this essential objective.
Soccer, Basketball, Formula One, Singing, Watching NFL, Reading
Reference
Quality Assurance Manager
GIHOC Distilleries Company Limited
+447534216158
Architect, Project Manager, CEO
KODANA group of companies
+ 233 27 753 9310
Research Fellow at West African Centre for Cell Biology of Infectious Pathogens (WACCBIP)