Websites
Summary
Overview
Skills
Professional Credentials
Affiliations
Work History
Education
Some Relevant Trainings
Accomplishments
Additional Information
Referees
Quote
Timeline
Receptionist

Anthony Obi

Accra

Summary

Experienced Civil Engineer with a focus on planning, operating, and managing processes and systems that ensure the impact of human interactions and interventions on the environment is minimized. Highly experienced in the operation and management of civil (building, water, and wastewater) facilities and projects. Also proficient in production planning and performance management of oil and gas assets.

Overview

26
26
years of professional experience

Skills

  • High interpersonal and team skills; dependable team player with excellent collaborative and motivational abilities to ensure delivery of team goals.
  • Strong innovative and analytical skills; adept at efficient forecasting of future events from historical trends.
  • Effective Leadership skills with demonstrated ability to identify and negotiate win-win solutions to conflicts.
  • Effective communicator of work and project details with keen foresight and demonstrated ability to articulate potential issues and challenges.
  • Excellent organizational skill with focused attention to detail, high accuracy, and commitment to meeting deadlines and targets.
  • Proficiency in computer usage with ability to quickly learn and use new software applications required for work execution and delivery. Proficient in MS Projects, Word, Excel, and PowerPoint
  • Production Planning and Performance Management.
  • Water Resources Management
  • Facilities Planning and Management
  • Project Planning and Management
  • Stakeholder Management
  • Contract Management

Professional Credentials

  • Civil Engineering Professional License issued by the Council for the Regulation of Engineering in Nigeria
  • Facility Management Professional Certificate issued by the International Facilities Management Association
  • Project Management Professional Certificate issued by the Project Management Institute

Affiliations

  • Council for the Regulation of Engineering in Nigeria (COREN)
  • Nigerian Society of Engineers (NSE)
  • Project Management Institute (PMI)
  • International Facilities Management Association (IFMA)
  • International Water Resources Association (IWRA)
  • American Society of Civil Engineers (ASCE)

Work History

Oil & Gas Asset Management Support

Shell Petroleum Development Company Nigeria Plc
Bonny Island
2016.10 - 2018.08
  • Managed civil operations and maintenance of Terminal Offices, Residences, Plants, and Air and land Logistics facilities.
  • Determined stakeholder expectations and involvement and resulting impact on all managed civil projects in Bonny Oil and Gas Terminal (BOGT).
  • Coordinated implementation of work authorization system deployed for management of resources to create civil project deliverables.
  • Managed quality control processes for ensuring correctness of project deliverables and coordinated final acceptance activities for closing Projects.
  • Analyzed personnel movement trends and successfully obtained Stakeholders’ approval for 50% increase in seat allocations for the Terminal in the Port Harcourt to Bonny Island water logistic movement.
  • Implemented BOGT Accommodation Occupancy Optimization exercise using guidelines in the Terminal Occupancy Criteria to achieve 13% reduction in permanent Personnel on Board (POB) occupancy numbers.
  • Coordinated the BOGT Onsite Integrated Asset Planning and managed the work preparation, planning and Management of Change approval and authorization processes.
  • Developed internal processes to audit requests for funds required for work execution for the Terminal’s projects/activities and thus achieved near 100% request approval from the Organization’s Commitment Control Board (CCB).

Oil and Gas Planning and Performance Management

Shell Petroleum Development Company Nigeria Plc
Port-Harcourt
2012.10 - 2016.10
  • Developed 5-year weighted average historical unscheduled and third-party deferment trends to forecast the 15th-18th annual Oil Production unscheduled and third-party deferments for the Shell Petroleum Development Company (SPDC)'s assets.
  • Developed annual oil and gas deferment figures for the assets at different value streams for input into the Medium Term-Integrated Asset Planning and Long-Term Business Planning forecasting processes.
  • Analyzed SPDC Oil and Gas Assets’ production performance as well as the Production Support budget performance and determined variances against plans. Undertook necessary adjustments in line with Stakeholders' expectations.
  • Developed a robust process framework for predicting Oil and Gas Production Full Year Latest Estimates (FYLE) derived from approved quarterly corporate forecasts and employed for quality control and alignment of the Medium- and Long-Term forecasts with the actual performance of the Organization’s Assets.
  • Managed SPDC Production Services Budget which included coordinating budget input and review from different departments as well as development and obtaining approval of final budget from senior management and subsequent monitoring of budget performance.

Technical Support-Real Estate

Shell Petroleum Development Company Nigeria Plc
Lagos
2012.05 - 2012.10

Developed Project Initiation Notes and Scopes of Work for:

  • 10,415sq.m, 3-floor Lagos Learning Hub Project.
  • Shell Port Harcourt Industrial Area 60-bed Hospital Medical facility upgrade.
  • Shell Port Harcourt Industrial Zone optimal space availability and utilization assessment.

Site Manager, NSS Center

Shell Nigeria Exploration and Production Company Nigeria Plc
Lagos
2011.03 - 2012.05
  • Coordinated rehabilitation and conversion works of the 5-floor Eleganza building to a SHELL Nigeria Shared Services Centre.
  • Managed and coordinated provision of world class integrated facilities operation and maintenance service at completed center.

Facilities Operation and Maintenance Manager

Shell Nigeria Exploration and Production Company Nigeria Plc
Lagos
2006.05 - 2011.03
  • Managed contracting and implementation of the SHELL Head Office, Freeman House (FMH), Security Enhancement Works comprising installation of 3 units of access control facilities and 100nos, metallic 2-hr fire-rated doors to replace existing 30mins fire-rated wooden doors. Also managed contracting and remodeling of entire 2 wings of the 4th floor of the building as well as the 20th floor emergency escape provisions which included gantry walkway, 2nos single-entry escape chutes and platforms.
  • Supervised erection of exhaust masts for 3nos CAT Generators of 4,478KVA combined rating.
  • Reviewed sewage assessment reports on the Shell Lagos Head Office sewage treatment plant which evaluated environmental impact of the plant effluent discharge. Developed scope of studies and re-design for upgrading the 103cu.m/day plant and coordinated the studies and designs, as well as the contracting processes for the upgrade. The plant upgrade involved modifying existing conventional activated sludge treatment system to include, primarily, an Equalization Tank complete with screening baskets and macerators for handling non-degradable solids. The equalization tank was designed to take care of shock loads from the 21-floor building by receiving raw sewage from the building and pumping same into existing aeration tank in a controlled manner. Upgrade also included replacing existing 2nos air blowers of about 145cu.m/hr. each to blowers of 400cu.m/hr. each to ensure air supply to the aeration tank is sufficient for aerobic digestion, efficient air transfer and for the airlift recycle system. Also, the existing effluent tank was modified and baffled, into a chlorine contact section to provide a contact time of 0.5hrs and an effluent pumping tank; all aimed at enhancing final effluent quality.
  • Managed and supervised construction of the FMH sewage treatment plant upgrade works aimed at bringing the plant operations to regulatory compliance. Due to challenging brownfield nature of the works site; rehabilitation of plant while still operational, built-up area with limited space and high groundwater level, work method had to be extensively and continually reviewed and supervised. The work method included temporarily diverting/re-routing sewer lines from the building to the plant, identifying and relocating sub-surface service facilities (electric cables and water lines) and construction of the equalization tank by pre-casting segments of the tank walls on site and placing cured segments to designed levels through a process of sinking and dewatering.
  • Conducted air quality assessments of existing FMH sewage treatment plants as well as upgraded plant in accordance with World Health Organization Air Quality Guidelines (WHOAQG). Assessment showed significant improvements in air quality after plant upgrade.
  • Managed provision of facilities operation and maintenance of FMH 14cu.m/hour and t53 Bourdillon Road 10cu.m/hour water treatment plants and supporting 250m deep-water boreholes.
  • Coordinated contracting processes for and supervised rehabilitation works at the treatment plants and construction of back-up boreholes for the plants.

Construction Manager/Asst. Project Manager

NESTOIL Nigeria Limited
Warri
2000.09 - 2003.06
  • Reviewed and evaluated designs and provisions for the Egbeleku Landfill and Integrated Waste Management Facility Project in Warri. Coordinated and integrated the local and foreign components of the consequent re-engineering and redesigns of the Project undertaken by Canadian main consultants (EBA Engineering Consultants) and local sub-consultants
  • Identified shortcomings, during the design review, in the geotechnical and geophysical investigations of proposed site, resulting in doubts that original designs could be implemented and material requirement and source for project implementation was feasible. Project site open-up works based on original design also showed that topographic and hydrologic evaluation of the project site was insufficient for the works implementation. Coordinated site investigations for the required project re-engineering which resulted in change of landfill location and material sourcing through hydraulic sand-winning by inland (sub-surface borrow area) dredging.
  • Managed implementation of the 7.5 Km Adeja – Egbeleku access road, 4nos Landfill Cells’ 300,000cu.m hydraulic sand-filling, and 90cu.m/day sewage treatment plant components of the Project.

Civil/Design Engineer

DAMTECH Nigeria Limited
Jos
1997.09 - 2000.01
  • Conducted field condition assessments to determine civil rehabilitation works for the Shiroro Hydro-power dam and carried out designs of the works in collaboration with Huwecon Ltd. Project involved onsite condition inspection of dam and appurtenances, evaluation of required rehabilitation and design of rehabilitation works as well as providing a work execution program and a priced bill.
  • Undertook engineering studies and preliminary designs for the Gambaki Dam Project. Project conceptualized impounding of a surface water reservoir to recharge ground water basin which fed deep boreholes as source of water supply to nearby Azare Town, 50 km away, in Bauchi State. Conducted investigations of River Gambaki catchment area topography and hydrology as well as subsurface hydrogeology to identify suitable location for siting the dam across the river channel.
  • Undertook engineering studies and preliminary designs of the Bunga-Jamare Basin to the Komadugu-Gana Basin inter-basin water transfer project.
  • Performed Hydrological analyses of Donga River, as part of the Donga Bridge Project design, in collaboration with Parkman Consultants. The bridge project was designed to convey the Wukari – Rafin Kada - Donga – Mararaba road across the Donga River near Donga Town. The river has its source within northern slopes of the Cameroon mountains with its upper catchment lying within the Mambilla Plateau at the border of the two countries. The hydrological analysis was carried out to determine the optimal bridge underdeck elevation above the maximum flood level at the bridge site. The analysis incorporated plans for future development of Hydro-power dams at Gembu on the plateau and Manya, down the plateau escarpment, both upstream of Donga Town. Conducted site investigations of the river channel near Donga town to determine appropriate bridge crossing location, collected and collated historical rainfall and river flow data of the Donga and neighboring catchments and carried out statistical and correlation analysis to forecast peak river discharge and stage at Donga with and without upstream dam developments as integral part of the Analysis.

Senior Executive Engineer / Asst. Project Manager

ENPLAN Group
Katsina
1995.09 - 1997.09
  • Coordinated design review, construction supervision and contract management of the Zobe water supply and Irrigation project. The water supply component, comprising of treatment works, and pumping and transmission systems, was designed to supply 70,000cu.m/day of potable water to Katsina and environs using, as source, water impounded by the Zobe Dam across the Karaduwa River. Irrigation component was designed to irrigate by gravity, through a network of earth and concrete lined canals, 5,200ha of farmland on both sides of the river downstream of the dam.
  • Coordinated engineering studies and undertook preliminary and final engineering designs of Sabke Dam, Irrigation, and Water Supply project. Project was designed to irrigate 1,500ha of farmland and supply 12,000cu.m/day of potable water to Daura and its environs, in Katsina State. Managed contracting processes of project implementation works, which included production of Bills of Quantities and contract requisition documents for component works. Conducted project bidding and evaluations culminating in selection of contractors as well as supervised works implementation by the successful contractors.
  • Coordinated field condition assessments and undertook preliminary and final engineering designs for rehabilitation works for four small earth Dams (Nassarawa, Yasha, Koza and Karkarku). Similarly managed contracting processes of the projects’ implementation works.

Civil/Dam Design Engineer/Civil Construction Supervisor

WADSCO Nigeria Limited
Kano
1990.08 - 1995.09
  • Performed Civil, Infrastructural, and Dam safety reviews of Challawa Gorge Dam Designs.
  • Provided client representation and onsite supervision for construction of the Challawa Gorge Dam Project. Project comprised a 7.9km long homogenous earth fill dam across the Challawa River with a 600m long Ogee Spillway and 2.5m diameter metallic intake penstocks encased in reinforced concrete surrounds.
  • Participated in developing Dam Break Scenarios and carried out computer simulations and studies of Dam breaks for the possible breaching of the Challawa, Tiga and Watari Dams all in Kano State. Also determined possible inundation levels of the generated flood(s) on downstream communities and how these floods can be efficiently conveyed to downstream Hadejia barrages and irrigation fields. Also developed and communicated appropriate channel improvement works and emergency preparedness measures to the River Basin authorities.
  • Participated in Environmental Impact Assessment (EIA) of impact of Challawa and Tiga Dams on the upstream tributaries of Hadejia River.
  • Participated in EIA of impact of the Kafin-Zaki Dam on the Hadejia-Nguru wetlands and downstream ecosystem of the Yobe River Basin.
  • Carried out field investigations and preliminary designs for the Waya Dam and Irrigation Project for irrigation of 2,000ha of farmland with water impounded by dam built across the Waya River (a head water of the Gongola River). Performed hydrological and hydraulic designs of the Udubo Irrigation and Dam Project, also in Bauchi State. The Udubo Project was designed to impound Misau River for irrigation of 2,000ha of farmland around Udubo Township.
  • Coordinated front-end engineering and preliminary engineering designs of the Koreyel flood control Project in Roni, Jigawa state. Project comprised design of a flood control detention dam across the River Kolin Shushashi, one of the headwaters of the Sabke River, and channel improvement works, to control and mitigate against downstream flooding of communal lands.
  • Coordinated engineering studies and undertook preliminary and final engineering designs of the Datsin Hausa Flood Control and Attenuation Dam Project. Project conceptualized provision of a detention dam at Datsin Hausa to attenuate and mitigate impact on downstream reaches of the River Benue of flood water resulting from emergency release, during peak flow periods, of impounded water in theLagdo Dam Reservoir on the upstream channel of the river in Northern Cameroun. The Project also incorporated provision of river training and bank flood control levees along some stretches of the river.
  • Coordinated engineering studies and undertook engineering designs of Katsina- Ala River Flood Control and Attenuation Dams Project. Performed dam failure scenario simulations of the natural dam along the rim of the crater Lake Nyos in the Cameroons in event of a probable maximum and destructive eruption of the crater. Also conducted river channel studies to identify suitable locations for siting of the flood attenuation dams along the Katsina- Ala River channel. Project conceptualized provision of a series of three detention dams located along the river channel to control and attenuate the flood anticipated to result from failure of the natural Lake Nyos rim dam. The resulting flood was anticipated to flow into the Katsina-Ala River which has its source in the Lake area and flows through Katsina-Ala town before emptying into River Benue in Nigeria.
  • Undertook Dam safety and performance inspections, and evaluation of design and as-built construction procedures, provisions, and condition assessment for ten existing Dams in three states of Nigeria, (FCT, Niger, and Plateau) in the National Water Rehabilitation Project.
  • Undertook designs of rehabilitation works identified in the condition assessment and evaluation of the ten Dams.
  • Conducted field condition evaluations and final designs of rehabilitation works for water supply schemes in Niger State in the National Water Rehabilitation Project

Civil Engineering Trainee

EJCU, Specialist Engineering Consultants
Jos
1988.08 - 1990.07
  • Participated as team member for safety and performance evaluation as well as formulation and preliminary engineering designs of remedial works for the Goronyo Dam in Sokoto State.
  • Participated as team member for safety and performance evaluation as well as formulation and preliminary engineering designs of remedial works for Oyan Dam in Ogun State.
  • Member of design team for engineering studies and preliminary design of Lake Geriyo Flood Control Project in Borno State.
  • Member of the design team for the engineering studies and preliminary engineering designs of Obudu dam project in Cross River State.

Education

PMI Project Management Professional Certificate - Project Management

Cambridge Centre of Excellence
Accra, Ghana
12.2020

Facilities Management Professional - Facilities Planning And Management

International Facilities Management Association
Lagos, Nigeria
09.2009

Bachelor of Science (Civil Engineering) Degree - Civil Engineering

University of Lagos
Lagos, Nigeria
07.1985

Some Relevant Trainings

Auditor/Lead Auditors Course on Quality Management Systems by Ashbrooke Quality Assurance International Limited.

Urban Waste Management: Affordable and Appropriate Technologies and Strategies Training by Centre for African Settlement Studies and Development and United Nations Centre for Human Settlement (HABITAT

Cost Engineering M-187 Course organized by Shell Global Solutions in Rijswijk, Netherlands.

Root Cause Analyses and Total Reliability through World Class Maintenance courses organized by Marshall Institute.

Seminar on Green Building and Sustainable Design by Comprehensive Design Services.

The KELVIN TOP-SET Senior Investigator Course conducted by The Kelvin Consultants Ltd, UK.

HSSE Management Awareness Training Modules organized by SHELL Open University (SOU).

Supply Chain Academy Courses on Contract Management organized by SOU.

Shell Supply Change Management courses to the Knowledge and Skill levels.

Shell HSSE Courses - Up to Knowledge level.

SHELL Frontline leadership training in the following areas:

  • Leading in Shell
  • HR Essentials
  • Difficult conversations
  • Coaching
  • Building High Performing Teams
  • Delivering results through Teams.
  • Supporting and sustaining change

Accomplishments

Bias for action 2015

• Award in Recognition of value demonstrated in personal Bias for action in the delivery of the Bonga and SPDC Q2 Full Year Latest Estimates numbers with required details to finance for the SHELL Vice President’s (Nigeria and Gabon) approval 2 weeks ahead of schedule.

Commercial Acumen, Safety (Goal Zero), and Integrated Delivery 2017

• Award for the display of Commercial Acumen, Safety (Goal Zero), and Integrated Delivery in Integrated Asset Management of the Bonny Oil and Gas Terminal.

Contribution to building of culture of compliance 2007

• Recognition for outstanding contribution to the building of a culture of compliance in SHELL.

Effective and continuous compliance 2011

• Award for effective and continuous compliance to SHELL regulations, standards, and Organization’s Policies.

Long Service Award 2017

• The SHELL Organization 10-year Long Service Award.

Additional Information

VOLUNTEER WORK

  • Special Marshal Jan 2008 - Dec 2009,

Federal Road Safety Corp - Shell Branch, Lagos

  • Treasurer Jan 2011 - Sep 2012

Petroleum and Natural Gas Senior Staff Association of Nigeria (PENGASSAN) - SHELL Lagos Branch, Lagos.

Referees

Michael Chukwuma Umolu, P.E.

Senior Engineering Manager

Parsons Corporation

Atlanta Metropolitan Area

Georgia, USA.

Tel: +1(415) 577 7444

Ebenezer Sada, P.E.

Principal Engineer,

T & M

4675 Lakehurst Court, Suite 250

Columbus, Ohio 43016.

Tel: (D) +1(614) 408-9225, (M) +1(614) 579-0021

ESADA@TANDMASSOCIATES.COM

Ted. I Theodore

Managing Partner, Ischus Consulting

Off Donatus Odum Street, Off Kushenla Road,

Elegushi, Lekki Phase I

Lagos, Nigeria

Tel: (O) +234(1)342 3916; (M): +234(0)818 011 1727

Maanweg 66,

2516AA, The Hague, Netherlands

Tel: (O) +31-70-3869235

Dotun Adegoke

Lead Structural Engineer,

United mining Services Group, Mets

Woodmead, Johannesburg,

South Africa.

Tel: +27 73 026 8033

Osita Nnajiofor

Bonny Oil & Gas Terminal Assets Installation Manager

Bonny Island

Shell Petroleum Development Company Nigeria. Plc

Tel: +234(0)802 292 1627, +234(0)807 032 5868

Engr. Jerome C. Umolu (EJCU)

Special Consultant

Managing Director,

DamTech Nigeria. Ltd.,

117, Liberty Dam Boulevard,

Off Bauchi Ring Road,

Tel: +234(0)803 450 0060

Jos, Plateau State.

Quote

When Purpose is not known, abuse is inevitable.
Myles Munroe

Timeline

Oil & Gas Asset Management Support

Shell Petroleum Development Company Nigeria Plc
2016.10 - 2018.08

Oil and Gas Planning and Performance Management

Shell Petroleum Development Company Nigeria Plc
2012.10 - 2016.10

Technical Support-Real Estate

Shell Petroleum Development Company Nigeria Plc
2012.05 - 2012.10

Site Manager, NSS Center

Shell Nigeria Exploration and Production Company Nigeria Plc
2011.03 - 2012.05

Facilities Operation and Maintenance Manager

Shell Nigeria Exploration and Production Company Nigeria Plc
2006.05 - 2011.03

Construction Manager/Asst. Project Manager

NESTOIL Nigeria Limited
2000.09 - 2003.06

Civil/Design Engineer

DAMTECH Nigeria Limited
1997.09 - 2000.01

Senior Executive Engineer / Asst. Project Manager

ENPLAN Group
1995.09 - 1997.09

Civil/Dam Design Engineer/Civil Construction Supervisor

WADSCO Nigeria Limited
1990.08 - 1995.09

Civil Engineering Trainee

EJCU, Specialist Engineering Consultants
1988.08 - 1990.07

PMI Project Management Professional Certificate - Project Management

Cambridge Centre of Excellence

Facilities Management Professional - Facilities Planning And Management

International Facilities Management Association

Bachelor of Science (Civil Engineering) Degree - Civil Engineering

University of Lagos
Anthony Obi